IXL CBI (LTran IX2)

Safe routes at every station,

from urban rail to high-speed rail.

Electronic interlocking coordinates routes, points and signals so that trains can run safely.

SIL 4
Highest safety integrity level
2oo3
SML400 safety platform

01

What railway operators and infrastructure owners need

01
No conflicting routes

Each route request is checked against points, signals and track occupancy before it is locked.

02
High safety

The 2-out-of-3 (2oo3) safety platform is designed for both safety and continuous operation.

03
One station or a whole section

CBI can be applied to both standard and interlocking stations, and can control several stations at once through distributed control.

04
Uninterrupted train service

Redundancy lets the system switch to a safe state when a fault is detected.

02 · HOW IT WORKS

From route request to field equipment

CONTROL
CTC or ATS

Sends a route request from the control center or local console

INTERLOCKING
Electronic interlocking

Checks every safety condition, then locks the route

FIELD
Signals, points, track circuits

Executes the command and reports its status back

03 · PRODUCTS

Electronic interlocking (CBI)

CBI (LTran IX2) SIL 4
Electronic interlocking (CBI), adapted to each customer’s station layout and existing systems, from urban rail to high-speed rail.
  • Distributed LTran IX2 CBI 520V, SIL 4 certified
  • Single-station or multi-station, with distributed control
  • Integrates with CTC, safety management and ATP systems
  • On high-speed lines, a 2-out-of-3 safety platform is in service on the Gyeongbu and SuseoPyeongtaek HSR (separate platform)
  • Shares train operation data with KTCS-2 in real time

04 · REFERENCES

From light rail to national networks

KOREA

  • Gyeongbu HSR

    High-speed rail

  • Suseo–Pyeongtaek HSR

    High-speed rail

  • Sillim Line, Seoul

    Urban rail

OVERSEAS

  • Bangladesh

    Akhaura–Laksam

  • Thailand

    Chachoengsao–Laem Chabang

  • Taiwan

    Taoyuan Railway, Taitung–Zhiben

BUILDING TRUST, MOVING FIRST.

Have a signaling project in planning?

Tell us about your line and we will share the relevant product data and references.